Configuration Management System

In PMP, all change systems should integrate with Change Control System. On the other hand, all project related matter should be stored into Configuration Management Systems.

The following areas should be integrated into Change Control System:
  • Scope
  • Cost
  • Schedule
  • Contract
  • Risk
  • Manage Team
  • Manage Stakeholder
  • Quality