What is Three Point Estimation

In PMP, the term "Three Point Estimation" is a technique used to estimate the time required for a project based on historical information. This includes:
  • Most Optimistic
    Best case scenario in which nothing goes wrong and all conditions are optimal.

  • Most Likely
    The most likely duration and there may be some problem but a lot will go right.

  • Most Pessimistic
    The worst case scenario which everything goes wrong.