Direct and Indirect Costs

What is the difference between Direct and Indirect Costs?

  • Direct Cost
    Costs that are directly attribute to work on the project.
    eg. training cost, travel cost, wages, cost of material used in the project, etc

  • Indirect Cost
    Overhead items or costs incurred for the benefit of more than one project.
    eg. taxes, fringe benefits, etc